The first two weeks were brutal, in a really good way. We worked with FOOT--Friends Of the Ouachita Trail--which is a group of retirees that have way more beef than I do. We hauled logs, gravel, concrete, and tools down a big, steep hill riddled with switchbacks. We worked 4-6 on some of the bigger logs, while 2 of the FOOT members were able to carry them down without a problem.
The first trail shelter we worked on wasn't very hands-on--we spent most of the time hauling while FOOT did the actual building. Still, the sense of accomplishment was very real when we saw the finished product.
The second was much more hands-on--the team worked on the shelter start to finish, from the post holes to the roof.
Back at "home," we ran into issues pretty constantly. In addition to the first windy night that forced us into campers, we dealt with power outages, leaks (which were duly duct taped), breaking doors... the list definitely goes on.
For a few days, ice kept us on the mountain...
... and, since it wasn't safe to do trail work, we were left to clean the campground bathrooms and clean infinities of rat poop out of the historical house onsite.
But we kept our attitudes positive... for PT one day, we had a dance party in the bathroom--the only place that was warm enough to stay.
We ended up moving a couple hours south to Historic Washington State Park to avoid an ice storm--a wise move, as almost a week later Queen Wilhelmina still doesn't have water or power. But that's a topic for another post.
Though we've had not a little turmoil this round, I'm glad it was the first. If we can survive this project, we can survive anything. And it was definitely good to be able to see tangible evidence of the work we were doing--a shelter for weary or weather-bound travelers, built by our own hands.







You guys are doing great things. I know they will be appreciated for some time to come. :)
ReplyDelete